Results [0]

Award for brickwork at Silvertown
The dRMM-designed Greenwich portal building has won Project at the Year at the Association of Brickwork Contractors Awards. Read More

dRMM’s portal buildings welcome users into the new Silvertown Tunnel
Designs for a footbridge in addition to the two portal buildings mark dRMM’s first project in the infrastructure sector. Read More

Research report Measuring Mass Timber is published
The report presents the methodology and findings of an two-year research study funded by Built by Nature. Read More

Promotions at dRMM Studio London
We’re very pleased to announce some promotions in our London studio. These are in recognition of the contribution each of them makes both to the work of the practice, and... Read More

RIBA London Awards shortlisting for two dRMM projects
Two dRMM projects have been shortlisted for RIBA London Awards 2025. WorkStack has been shortlisted for London (South East) and Wick Lane for London (East). Read More

dRMM working with ECF on Passivhaus homes
dRMM are working with ECF on Farmer Norton, one of the early developments in their 240-acre Crescent Salford Masterplan Read More

Our latest B Corp Impact Report
Just over a year ago, dRMM achieved B Corp Certification. Every B Corp commits to publishing an annual impact report reviewing progress, which gives us a chance to formally assess... Read More

Regeneration of 980 Great West Road
dRMM are working with developers Hadley and masterplanners Haworth Tompkins on 980 Great West Road, the regeneration of the GSK site in Brentford, west London. The vision is to create... Read More

dRMM has moved
dRMM has moved. After three decades in SE1 we have relocated to Coate Street in Hackney. Read More

dRMM wins Wood Award with WorkStack
WorkStack, our light industrial project for the Greenwich Enterprise Board has won a Wood Award. Read More

Post Occupancy Evaluation on Wick Lane
We are committed to undertaking Post Occupancy Evaluations (POEs) on our past projects. However, residential buildings present challenges with distributed ownership and individual metering, sometimes combined with CHPs and renewable... Read More

Update on the ongoing retrofit of our new studio
We’re retrofitting our new studio in E2 and took the team and some special guests for a site visit, updating everyone on progress. Read More